Home
Company
Hydro
Plastics Technology
Work piece cleaning
Hydro
Price Quotations
Questionnaire Turbine
Questionnaire trash rack
Registration of the flow rate and Leveling without Leveling Instrument
The OSSBERGER Turbine for asynchronous and synchronous water plants
Kaplan Turbine
Pelton Turbine
Water turbine controller
Trash rack cleaners
Contact
Homepage
»
Hydro
»
Price Quotations
»
Questionnaire Turbine
Questionnaire for Price Quotations of Water Turbines - Online
Contact Name
*
Company
Street
*
ZIP/area code, city, township
*
Country
*
Phone:
*
Fax:
E-Mail:
*
PROJECT NAME
*
PROJECT LOCATION
1. Gross head [m]:
2. Available flow?
January [l/s]:
February [l/s]:
March [l/s]:
April [l/s]:
May [l/s]:
June [l/s]:
July [l/s]:
August [l/s]:
September [l/s]:
October [l/s]:
November [l/s]:
December [l/s]:
Please provide a flow duration curve for the project site.
Do you consider as important that maximized annual generation is obtained?
yes
no
3. Max power output expected at generator terminals?
4. How is the flow conducted to the hydro turbine?
a) Open canal
Length [m] :
Cross section [m]
b) Penstock:
Length [m]
Diameter [mm]
Material of pipe:
Max. permissible pressure rise in the penstock (if any) [bar]:
5. Altitude of installation [m above sea level]:
6. What do you want to do with the energy?
a) Current production
yes
no
Frequency [Hz]:
Nominal Voltage [V]:
Synchronous generator
yes
no
if synchronous generator, please select:
Stand-alone operation: Autonomous power generation for the supply to an independent grid system (no public mains existing)
Parallel operation with the public mains
Parallel operation with the public mains and stand-alone operation
Asynchronous generator (mains paralleling):
yes
no
b) Transmission
yes
no
7. Water quality (e.g. high abrasive contents, pH value etc.)
8. Do you have a water license or permit?
yes
no
9. Scope of delivery:
Turbine
Regulator
Speed increaser (if required)
Generator
Switchboard
Generator main breaker
Do you consider as important to have minimal maintenance requirements?
yes
no
Please send us a project drawing or sketch along with your inquiry.
5-2-12.pdf
Questionnaire for Price Quotations of Water Turbines for download
21 K
OSSBERGER GmbH + Co, All rights reserved.